Location: | Menu / Energy |
Scope: | Site |
License: | Only available for SMARTLINK: ENERGY |
The Energy KPIs are divided into 4 tabs:
NOTE: This feature is only available for installations where a central controller (e.g., Optimizer 4.0) is available
This overview indicates the central control ratio, which is calculated as follows:
- central control ratio (=hours under ES control / (hours under ES control + hours NOT under ES control and available) * 100%
. There are 4 states we take into account for this ratio:
- Under central control
- Under local control (no central control)
- Shutdown
- Communication error
The overview allows you to select specific machines from the machine list, located at the bottom. All the changes will be reflected in the top graphs.